Sokkeldirektoratet

Documents for the annual status report for fields in production are ready

nyhetsbilder_od27.jpg

9/2/2020 The updated guideline for the Annual status report for fields in production (ASR) and an attachment in excel format are now available.

See guideline (word) and attachment (excel) at the top of the list

Starting from 2020, ASR for fields in production must be submitted to the NPD by 15 October. The deadline is concurrent with reporting for the Revised National Budget (RNB). Coordinating these reporting deadlines will ensure a closer link between RNB and ASR.

Among other things, ASR is an important basis for the authorities’ assessment of applications for production permits. The guideline has now been revised and the process has been simplified by a closer link between RNB, ASR and production permit applications.

Deadline: 15 October

ASR with attached long-term plan must be submitted together via e-mail to the NPD by 15 October 2020: postboks@npd.no

Read more about the improvements 

Streamlined template for annual status report for fields in production

 

 

Updated: 9/4/2020

Latest news

Full house to hear about new technology on the NCS
6/6/2025 "Technology is one of the tools that can help generate additional values from the Norwegian continental shelf (NCS). At Technology Day new technology from different suppliers are presented."
New interactive map of deep sea data
6/5/2025 Today, the Norwegian Offshore Directorate is launching an interactive map, Deep Sea Surveys.
New Director of Offshore development and technology
6/5/2025 Producing the resources on the Norwegian continental shelf (NCS) so they generate the greatest possible values for society is an important driving force for the Norwegian Offshore Directorate's new director.
Proved suitable properties for CO2 injection and storage (9/6-1)
6/2/2025 A wildcat well drilled by Harbour Energy Norge and licensees in the “Havstjerne” storage project confirmed a reservoir that is suitable for injection and storage of carbon dioxide (CO2).
Oil discovery and dry well in the North Sea (31/4-A-23 F and 31/4-A-23 G)
5/28/2025 OKEA and the licensees in production licence 055 have discovered oil along the eastern flank of the Brage field.
Drilling permit for wellbore 35/11-31 S
5/23/2025 The Norwegian Offshore Directorate has granted Equinor Energy AS drilling permit for wellbore 35/11-31 S in production licence 090.
Drilling permit for wellbore 15/5-8 S and 15/5-8 A
5/22/2025 The Norwegian Offshore Directorate has granted Equinor Energy AS drilling permit for wellbore 15/5-8 S and 15/5-8 A in production licence 1140.
Production figures April 2025
5/20/2025 Preliminary production figures for April 2025 show an average daily production of 2 030 000 barrels of oil, NGL and condensate.
Oil discovery in the Norwegian Sea (6507/5-13 S and 6507/5-13 A)
5/20/2025 Aker BP ASA and its partners have made an oil discovery in the so-called E prospect near the Skarv field.
Drilling permit for wellbore 6406/11-2 S
5/19/2025 The Norwegian Offshore Directorate has granted Vår Energi ASA drilling permit for wellbore 6406/11-2 S in production licence 586.